The deadline is getting close and I need to get done. As Jan will tell you soon it was Fiberfest weekend in Almonte. a small town close to where we live. I was on the demo team for Sunday. So I planned to work on the shepherdess and sheep as my demo project. First I had to get the shepherdess some clothes. Not too hard you think or at least I thought.
I forgot to take starting pictures but here is the shirt and skirt ready for final fulling.
And this is the shrinkage after fulling
The skirt was fine but the shirt was way too stiff. so I made another using a lot less wool and felted it along with the cloak.
For the cloak, I decided to use some prefelt I had. I cut the first side a little bigger than the resist then folded it around and basted it into place. This seemed like the best idea to keep everything in place.
And here it is shrunk
I liked it and it fit well except for the hood. I didn’t like it at all. I thought for the hood I wanted, it would be best to do it separately. do more cutting and sewing. and shirt number 4. I don’t remember what was wrong with shirt 2 but shirt 3 would have been good if I hadn’t cut the neck too big.
And finally, all the parts of the clothing are dry and ready to move on to the next steps.
For the next post, I hope to have the shepherdess all done and a colourful flock of sheep for her to tend.
Looks like a ton of fiddly work. Well done for sticking with it.
Thanks Carlene. It was fiddley but I think it turned out well in the end.